Project Status: April 11, 2023 - Noise Impacts April 18-24

The City contractor, Filanc, is currently making preparations to install the new underground pump station structures. The final step of preparations will be to install shoring for the excavation operation. During the shoring installation, the surrounding area will be impacted by the noise generated from the operation.

Mitigation measures are in place which consist of sound reduction materials installed on the fence along the north and south property lines, however, noise levels will be elevated throughout the surrounding neighborhood during this phase.

The work will consist of sheet pile installation using a vibratory hammer. Large heavy equipment has been mobilized for this work.

Neighborhood Impacts

  • From April 18 to April 28, there will be a high level of noise and vibration, as a result of steel sheet pile driving and installation. A noise control plan is in place; however, please note - it will still be loud during those seven days.


Hours of Operation for Shoring Installation
Noise impacts will be limited to Monday-Friday between 7:00 am to 4:00 pm.